您的位置: 首页 > 标准信息  >  国外标准  >  欧盟电工标准  >  CLC/TS 50549-2-2015  Requirements for generating plants to be connected in parallel with distribution networks - Part 2: Connection to a MV distribution network
国内标准
国外标准
 

CLC/TS 50549-2-2015  Requirements for generating plants to be connected in parallel with distribution networks - Part 2: ...

标准编号:CLC/TS 50549-2-2015
分享到:

英文标准名称:Requirements for generating plants to be connected in parallel with distribution networks - Part 2: Connection to a MV distribution network
标准状态:现行有效
语言:英文版,中文版
发布日期:2015-01-16
实施日期:2015-01-16
标准类别:欧盟电工标准

国际标准分类法(ICS):电气工程 >>旋转电机 >>发电机
标准页数:58
标准目录:Foreword
1 Scope
2 Normative references
3 Terms and definitions
4 Requirements on generating plants
5 Conformance test procedure
Annex A (informative) - Interconnection requirements
Annex B (informative) - Remote information exchange
Annex C (informative) - Frequency stabilizing services
Annex D (informative) - Loss of Mains and overall power
        system security
Annex E (informative) - Examples of protection strategies
Annex F (normative) - Abbreviations
Bibliography
文件格式:纸质版或者PDF电子版(用Acrobat Reader打开)或Word版本doc格式
PDF格式 CLC/TS 50549-2-2015  免费下载 Word格式 CLC/TS 50549-2-2015  免费下载免费标准下载
标准关注次数:1571

文件大小:915KB
添加时间:2015/03/15
评论
序号
评论内容
用户名
日期
发表新评论 或 请提供可参考的全文下载链接
用户名
 
相关免费标准
 
 
本类标准下载排行
 
 
本类最新免费标准
 
免费标准下载网 |标准分享网 |联系我们 | 友情链接 |
版权所有:www.UPBZ.net   | 鲁ICP备14035066号-3